(22) 458-857-9636 Zarząd redakcji portalu

Turnkey finish of the house

This stage of building should finish with already made foundation stage. What does it mean? In practice, so that the house is equipped in doors, windows, furnace and radiators, they are such utilities as electricity, water and gas. In addition, the walls should be smoothed and floor should be levelled. For such house may easily enter a team responsible for interior design and plan laying the wooden panels on the floor, tiles and painting walls, so you can slowly bring all furniture. As for the exterior side, the house must also be fully finished. Mainly is is about elevation and additional elements.